BHU210-73 Batch Assembly: 15 Bed Head Units in the Workshop

banner

BHU210-73 Batch Assembly: 15 Bed Head Units in the Workshop

September 20, 2026

This workshop batch covers the assembly of 15 Kersai BHU210-73 bed head units. The photographs and video follow the main visible steps, from the LED lighting section and medical gas outlets to the nurse call substation, power modules, switches and end caps.

The finished-unit photograph shows part of the batch. The material documents workshop assembly only; it does not represent on-site hospital installation or a test or certification result.

Lighting Section Assembly

The build begins with the lighting section. The LED light strip is positioned inside the channel, followed by the blue lampshade that covers and finishes this part of the housing.

Installing an LED light strip in a BHU210-73 bed head unit
Installing the LED light strip in the lighting channel of a BHU210-73 bed head unit.
Fitting the lampshade on a BHU210-73 bed head unit
Fitting the blue lampshade over the lighting section.

Medical Gas Outlet Installation

Medical gas outlets are fitted into the prepared positions on the front panel. After the outlet body is set in place, the decorative ring is installed to finish the opening around it. The photographs show the physical assembly sequence without making a claim about gas type, commissioning or performance.

Installing medical gas outlets in a BHU210-73 front panel
Installing medical gas outlets in the front panel.
Installing a decorative ring around a medical gas outlet
Fitting a decorative ring around a medical gas outlet.

Nurse Call, Power and Switch Modules

The nurse call substation is secured in its panel position. The power socket modules and light switches are then fitted into the row of prepared openings. Their exact specification and arrangement can vary by project, so the configuration shown here should be treated as this batch's workshop build rather than a universal specification.

Securing a nurse call substation in a BHU210-73 panel
Securing the nurse call substation in the panel.
Installing power sockets and light switches in a BHU210-73
Installing the power socket modules and light switches.

Housing Completion and Batch View

The trunking end cap closes the end of the housing and completes the visible profile. The final photograph shows several completed units from the 15-unit batch arranged together in the workshop.

Fitting the trunking end cap to a BHU210-73 bed head unit
Fitting the trunking end cap to finish the housing.
Completed BHU210-73 bed head units from a 15-unit workshop batch
Completed BHU210-73 units from the 15-unit workshop batch. The photograph shows part of the batch.

Watch the Workshop Video

The 59-second workshop video follows the same visible sequence, including the lighting components, medical gas outlets, nurse call substation, power modules and completed units. Select the image below to play it.

BHU210-73 15-unit batch assembly workshop video

If the player does not open, watch the video on YouTube.

About the BHU210-73

For the current product page and available configuration information, visit the BHU210-73 bed head unit page. Project requirements should be confirmed before configuration and production.


INQUIRE IMMEDIATELY

+86-19053271355

manager@kersaimed.com

未标题-1_0000_whatsapp
未标题-1_0001_微信