pop

Let’s Talk!

18 Bed Head Units Shipped: BHU307 and BHU210-73

banner

18 Bed Head Units Shipped: BHU307 and BHU210-73

September 22, 2026

On September 21, 2026, Kersai shipped a batch of 18 bed head units: 2 BHU307 units and 16 BHU210-73 units. The photographs below document the finished units and their packaging before dispatch.

Shipment overview

  • Shipment date: September 21, 2026

  • BHU307: 2 units

  • BHU210-73: 16 units

  • Total: 18 bed head units

Finished units and protective packaging

The photo set shows the two bed head unit designs before packing. Visible panel components include medical gas outlets, electrical sockets, switches and nurse call handsets. The group photograph shows part of the BHU210-73 shipment.

The packing photographs show protective film, foam lining and wooden crates. A separate view shows a packed unit alongside wrapped accessories, followed by the closed wooden crate.

Finished bed head unit before protective wrapping.
Finished bed head unit before protective wrapping.
Two finished units wrapped in protective film with foam lining.
Two finished units wrapped in protective film with foam lining.
Part of the BHU210-73 shipment before packing.
Part of the BHU210-73 shipment before packing.
A wrapped bed head unit and accessories inside a foam-lined wooden crate.
A wrapped bed head unit and accessories inside a foam-lined wooden crate.
Closed wooden crate prepared for dispatch.
Closed wooden crate prepared for dispatch.

Watch the shipment and packing video

Watch the shipment and packing video on YouTube

Explore the products

View the BHU307 and BHU210-73 product pages for further details.

INQUIRE IMMEDIATELY

+86-19053271355

manager@kersaimed.com

未标题-1_0000_whatsapp
未标题-1_0001_微信